News Journals

Museum Bezau / Innauer-Matt Architekten


+ 37

  • Space
    Space of this structure mission

    Space:
    408

  • 12 months
    Completion 12 months of this structure mission


    12 months:



    2024

  • Pictures
  • Producers
    Manufacturers with merchandise used on this structure mission

    Producers: Carpenter, Drywall set up, facade, Exhibition lighting, Media expertise, Metalwork, Paintwork, Shingle facade, Solar display, Timber development, Wood home windows


  • Lead Architects:


    Sandra Violand

© Dominic Kummer

Textual content description offered by the architects. The Museum Bezau intertwines the previous with the current. The historic, heritage-listed constructing is an excellent exhibit by itself – a showpiece that immerses the customer within the native constructing tradition and its shut connection between structure and craftsmanship. The extension ties in with the historical past and takes it additional in its language. With the continuation, the normal order of the Bregenzerwald home with its entrance and rear constructing sections is restored.

!operate(f,b,e,v,n,t,s)
{/*if(f.fbq)return;*/n=f.fbq=operate(){n.callMethod?
n.callMethod.apply(n,arguments):n.queue.push(arguments)};
if(!f._fbq)f._fbq=n;n.push=n;n.loaded=!0;n.model=’2.0′;
n.queue=[];t=b.createElement(e);t.async=!0;
t.src=v;s=b.getElementsByTagName(e)[0];
s.parentNode.insertBefore(t,s)}
(window, doc,’script’,’https://join.facebook.web/en_US/fbevents.js’);
fbq(‘init’, ‘350870482443432’);
fbq(‘observe’, ‘PageView’);