News Journals

Retrofit of Santa Maria School / Carvalho Terra Arquitetos


+ 28

  • Space
    Space of this structure mission

    Space:
    550

  • 12 months
    Completion yr of this structure mission


    12 months:



    2025

  • Images

  • Lead Architects:


    Bruno Carvalho, Carina Terra

© Guilherme Pucci

Textual content description supplied by the architects. The Early Childhood Schooling at Santa Maria Faculty operates in buildings constructed on the finish of the Nineteen Sixties, which have been expanded and renovated within the 2000s. The proposal was to develop a retrofit mission to modernize and replace the areas so as to meet new technological calls for, makes use of, and pedagogical practices, whereas making certain the preservation of the architectural options which are a part of the college’s identification.

!perform(f,b,e,v,n,t,s)
{/*if(f.fbq)return;*/n=f.fbq=perform(){n.callMethod?
n.callMethod.apply(n,arguments):n.queue.push(arguments)};
if(!f._fbq)f._fbq=n;n.push=n;n.loaded=!0;n.model=’2.0′;
n.queue=[];t=b.createElement(e);t.async=!0;
t.src=v;s=b.getElementsByTagName(e)[0];
s.parentNode.insertBefore(t,s)}
(window, doc,’script’,’https://join.facebook.internet/en_US/fbevents.js’);
fbq(‘init’, ‘350870482443432’);
fbq(‘monitor’, ‘PageView’);